I have 3 measures to be used in the report. Can I use a pie chart? If not, what are the other alternatives I have?

408    Asked by BrianKennedy in Tableau , Asked on Dec 5, 2019
Answered by Brian Kennedy

as per the requirement of the pie chart, we can use 1 or 2 measures only.

If you have 3 measures then you can go ahead with a dual-axis along with a line chart like this-



Your Answer

Interviews

Parent Categories